Breaking News
Loading...
Saturday, July 9, 2011

Info Post
Four bulletins this morning; full details and more photos later today.

-TEPCO has repaired and tested the spent fuel pool cooling and filtering system setup at No. 4 plant and found it to be sound.

-TEPCO has sent personnel into No. 3 reactor building, instead of a robot, to prepare a connection to inject nitrogen to No. 3 plant's dry well. The photos appear to show a large snap-type Hansen (or Swagelok, etc) coupling.



-NHK is reporting that it has obtained a not too widely circulated time frame outline for the entire plant recovery that details core removal in ten years.

-Preliminary assembly of No. 1 reactor building's cover is underway at Onahama, and the large crane at Fukushima Daiichi is now frequently seen in the live camera view.

MANY more details and photos later today.

6:10 AM Eastern Saturday July 9, 2011
ATOMIC POWER REVIEW

0 comments:

Post a Comment

:) :)) ;(( :-) =)) ;( ;-( :d :-d @-) :p :o :>) (o) [-( :-? (p) :-s (m) 8-) :-t :-b b-( :-# =p~ $-) (b) (f) x-) (k) (h) (c) cheer
Click to see the code!
To insert emoticon you must added at least one space before the code.