TEPCO will be very shortly beginning water injection to the No. 2 plant's reactor through the core spray line, exactly as has already been done with No. 3 plant. The amount will be adjusted upward incrementally through the core spray line and reduced through the feed line to attempt to maintain constant temperature with reduced water flow - the idea being to reduce the feed line more than the core spray line adds. This moves toward the goal of keeping temperature low and minimizing the buildup of contaminated water.
Multiple sources of water, and multiple pumps are available. In the best TEPCO press video yet, the entire setup as it is right now is explained in good detail and shown in detail. Maps are used to show site locations. See the newest video on the APR YouTube channel now; it is already on line and is at this moment the featured video.
Click here to get to the APR YouTube channel.
3:50 PM Eastern Wednesday September 14, 2011
ATOMIC POWER REVIEW
Fukushima Daiichi: Reactor water injection
Info Post
0 comments:
Post a Comment