Apparently water delivery on the No. 3 plant has been on since 2 PM local (Tokyo) time using a two-vehicle setup, with one pump vehicle draw...

Water Cannon operating unmanned; SITREP
Info Post
WILL DAVIS - COPYRIGHT 2010. NUCLEAR ENERGY NEWS, INSIGHT AND ANALYSIS. COVERAGE OF EVENTS WORLD WIDE, INCLUDING NEW PLANT CONSTRUCTION, OPERATION OF PLANTS NOW IN SERVICE, AND SHUTDOWN AND DECOMMISSIONING OF PLANTS. APR EMPHASIZES THE TECHNOLOGY OF NUCLEAR ENERGY, AS WELL AS THE HISTORY OF THE DEVELOPMENT OF THAT TECHNOLOGY. YOUR #1 NUCLEAR ENERGY SOURCE!
Apparently water delivery on the No. 3 plant has been on since 2 PM local (Tokyo) time using a two-vehicle setup, with one pump vehicle draw...