Breaking News
Loading...
Saturday, April 16, 2011

Info Post
I've just read the first concrete piece of evidence about how the new systems TEPCO is planning to install will work. Apparently, the idea is to obtain the feed for the pumps from, according to the article, "the reactor containment buildings." This still isn't clear, but it does seem to indicate that TEPCO acknowledges the leakage and intends to recycle water in a sort of non-sealed, but closed loop fashion for the primary cooling... the heat from which will be transferred to sea water.

Right now, without any further information, it might be assumed that TEPCO will be taking the water directly from the dry wells or the suppression pools. Important to note is that the primary side of this system will become highly radioactively contaminated, so that the equipment will need to be shielded or else access controlled as the rad level around the equipment will be very high.

5:00 PM Eastern Saturday 4/16
ATOMIC POWER REVIEW

0 comments:

Post a Comment